order a tester, but which one?
You are not allowed to view links.
Register or
LoginI don't know that you NEED a tester if you have SSC(s) on hand to test with. This might be a place to save $20.
I have one of these and it is nice, but I also didn't have a SSC at the time to test with.
Do I need to order the 3 conductor cable (at 100m minimum)?
Yes, you need the wire if you want to extend or splice smart strings AFTER the SSC ... if not, then you might be able to skip the wire.
It depends on what your doing. These would be to extend distances between nodes or modules. If you have someone around you who is also into DLA, they could share the cost with you. I split mine 50/50 with friend and its plenty of wire for both of us, but I"m not doing roof lines.
Do I need to order 3 conductor connectors?
THey are kind of nice, esp. for connecting things to the SSC output or to interconnect sections.
You don't need to have them, but they make modularizing things a lot easier. I'd get one pair for each SSC and then
another pair for any place where you want to possibly interconnect modules, flex strips, nodes. etc. Also think about
failure points ... with these connectors, you could easily take out a failed section and then replace with a backup, without having
to splice in the field
I recommend putting your order in a basket, then asking Ray for a combined shipping quote ... as it is almost always cheaper that way.
You can also chat as well.