I have a holiday coro 3 ring star. I assembled it, extra shrink tubing. I designed a mounting system using angle aluminum, 3/4" pvc pipe filled with 3/4" oak dowel. Light, Sturdy. I am pretty proud.
Then i look to see how to program the 3 dmx controllers. Contact David with my oops, he says i need a special programmer. I order this about 10 days ago.
Today David contacted his customers saying the order coming in from China via Canada, order got stolen. Fedex thinks they can find it. Nope, its lost. David is hustling to get another order.
2-3 weeks. So do i build the megatree without the star?
Luckily i happened to have ordered 80 rectable 1804's from Ray. I planed on making luminarias and make a matrix in the front lawn.
scratch that, i will replace the dumb rectangles with my smart ones.
Use an exacto and scrap hot glue from the 60 dub rectangles. Repair holes in the coro.
Now, I am checking the rectangles , 10 are bad. Luckily i only need 60.
when this is all over, i will be glad i did this. I now will have a 3 ring star with smart LED's. I will build effects for this star (30 in the outer ring, 20 in the middle, 10 in the center).
I can also remove the two heavy power supplies and the dmx controllers. The star is now way less than half the weight it was before. One cat 5 going up 20' to the top of the star.
This will turn out better.
I am having a lights on party Friday at 6pm. I only have two songs sequenced.
I have put up 64 snowfall tubes in my tree
6 arches, 24 pixels each
2 window, 7 segments each.
I am hoping to get megatree up tomorrow. Still need to hang 6x128 strings on the eaves.
and a few bugs for nutcracker.
tis the season ...
What will Friday bring? I have already sent out invitations to all my neighbors. Hot chocolate and mulled cider.
thanks