2012 GOALS:
Top Priority:
- convert most LOR controllers to LE(s) ... eliminate all by 2013
- go completely wireless where ever it makes sense to ... build some new Ex/Rx(s)
- go from 4 SS arches, to 8 SS arches ... improve angle, spacing and leveling
- build SSR4(s) w/DMX and add to key locations to optimize controller placement elsewhere
- double lights on (2) mini-megatrees from 2400 to 4800 lights each and to avoid looping over the top of 11' mini megatrees
- improve the RGB programming using Nutcracker, esp. on the arches and the 2011 mini-mega RGB toppers
- convert from using a single pixelnet flashes dongle to the etherdongle
Medium Priority:
- add 2 new coroflakes (never completed in 2011)
- improve sequencing all around on existing songs, maybe add new songs in December??
- add nutcracker single string effects to the tune-to sign RGB sequencing
Stretch Goals:
- still need to decide on whether to stay with latest version of LOR or use LSP 2.5 [ leaning LOR because of time ]
... will use xlights if needed to run shows, unless I can do it using E1.31 and LOR without changing too much
- build aether(s) and convert to if time permits
- add some RGB smart strings to my 6' 'super spinner' if time permits
- add some RGB smart string to something simple like the megatree pole, so do some experimental effects with
Staying motivated is a major issue ... I only started building stuff about 2-3 weeks back ... so I need to stay on top of that,
or I won't have a show in 2012 by default.