2 WEEKS, 2 WEEKS
Oh that hurts.
As with DrLucas it's the first year, I don't even know what all I have to do yet, but just some of it.
Finish sequencing the first song, that's been a struggle learning the software, but making some real progress now.
Then pick two more songs with family help
need to order a fm transmitter!
Cut 32 extension cords up and put them on the LE's
Get the LE CG-1500's from fedex in a day or two and mount the LE's
Waiting on the etherdongle, need to assemble that
connect the conductor to the etherdongle and get that working
put out the regular christmas stuff that will mostly be run by the LE's (weekend after thanksgiving normally)
finish painting the window frame hangers (1st coat went on yesterday)
dado a groove for the flex strips to set in and solder the strings together since ray has no 90 connectors for the
WS2811 flex strings
build another 10 or so SSC controllers and program
put the pex tubes up with the flex strings in them and cut them to length and set the proper node count
Hmmm, might make it, maybe!
assemble said window frame hangers and properly label them as to which window