Author Topic: Ready To Go Live Tomorrow  (Read 524 times)

Offline wbuehler

  • Administrator
  • Sr. Member
  • *****
  • Posts: 3579
  • Dont' that poster look dusty?
Ready To Go Live Tomorrow
« on: November 27, 2011, »
Thanks to all that have helped.  Also a big thanks to the Wife for re-wrapping the window frames with Smart Strings and the deer frames with LED's.
It has taken three software packages, Tweaks, Troubleshooting, and about 3 Days of setup, but we look to be ready to go live tomorrow.

The setup is as follows:

Dedicated Dell Laptop C Series 1.2Ghz with 1GB of Ram.
Light ShowPro V2 to make Sign Files and then Export to LOR format.
Vixen Sequencer and Scheduler outputting to EtherDongle.
X-Lights Scheduler running LOR files for sign outputting to LynxDongle using PixelNet.
DMX for existing LE's and Aether is generated off the Pixel Hub that the EtherDongle talks to.
Two smartstring hubs.
One EtherDongle
One LynxDongle

Bill



« Last Edit: November 28, 2011, by wbuehler »

Offline rrowan

  • Administrator
  • Sr. Member
  • *****
  • Posts: 5899
  • 08096
Re: Ready To Go Live Tomorrow
« Reply #1 on: November 28, 2011, »
Congrats to Bill and his Wife

Still working on mine. Seems like this year is harder than last year

Cheers

Rick R.
Light Animation Hobby - Having fun and Learning at the same time. (21st member of DLA)
You are not allowed to view links. Register or Login
Warning SOME assembly required

Offline inzeos

  • Sr. Member
  • ****
  • Posts: 505
Re: Ready To Go Live Tomorrow
« Reply #2 on: November 28, 2011, »
Also in the same boat. 

Tomorrow my SPT-2 is supposed to be delivered so I can finalize making wiring harnesses.

Have a few arches I want to try and get going; however, if I don't get them going no issues I'll keep them for next year.