DiyLightAnimation
Store => Sale/Trade => Topic started by: tlh on October 06, 2013,
-
Making final arrangements for the 2013 Season and have some extra equipment that I will not be needing. Kits are in the original, unopened packages in which they were received.
Two LE (version 5) Kits - $67.00 each SOLDTwo Bobcat DMX Tester Kits with Case (does NOT include wireless option) - $35.00 each SOLDTwo One Bobcat DMX Servo Kit - $20.00 eachThree Rainbow Flood Kits (http://www.seasonalentertainmentllc.com/rainbowfloodlight.htm) - $18.00 each SOLD
Prices do not include shipping (USPS Priority Flat Rate). PM with any questions. Thanks,
Terry
-
PM sent about Bobcat DMX test kit.
-
PM sent about 1 Bobcat DMX test kit.
-
doubleeaz and sabie, check your inbox. Updated the listing to note that the DMX testers do not have the wireless option - although there is a BOM from Mouser to add that functionality if desired.
tlh/Terry
-
PM sent on the LEs
-
Payment sent on the LE's :-)
I'm on my way now...
-
payment sent for dmx tester
-
** Slaps head** I read the post and was trying to decide if I needed the floods or not, and decided not since I'd have to pay shipping...now seeing it's you Terry, you're like two miles away from me....blond moment...oh well!!
Duane
-
** Slaps head** I read the post and was trying to decide if I needed the floods or not, and decided not since I'd have to pay shipping...now seeing it's you Terry, you're like two miles away from me....blond moment...oh well!!
Duane
LOL!!! Would liked to have helped out a neighbor, but they have found a new home in Washington. Will send a PM to you next time I have some spare equipment. BTW, did you go RGB this year?
Terry
-
** Slaps head** I read the post and was trying to decide if I needed the floods or not, and decided not since I'd have to pay shipping...now seeing it's you Terry, you're like two miles away from me....blond moment...oh well!!
Duane
LOL!!! Would liked to have helped out a neighbor, but they have found a new home in Washington. Will send a PM to you next time I have some spare equipment. BTW, did you go RGB this year?
Terry
Did is such a past tense word meaning it's complete already. I'm actually in the process of "going". Pixels should be shipped from Ray on the 9th of October. Planning 14 arches, 9 mini pixel trees and a pixel mega tree as well as some coro candy canes. Have all the necessary stuff to do all the pixels except for the megatree. Hoping that the zeus will get here in time....if not, might have to do some quick reprogramming and go back to the trusty LED strings and Expresses. Also going to Vixen3 which has been an awesome program. Still alot of things that could be added, but it's been so easy to control all these pixels with it. Thinking that I have enough time to get things completed as alot of the items have been built and are just waiting for pixels. Add in to that a work trip to DC next week and it all becomes a time bomb!
Did you add any pixels to your display this year?
Duane