Here is my feeble attempt at sequencing. I did not leave myself enough time. I think i like building the hardware more than sequencing. You are not allowed to view links. Register or Login
David, how much longer will have your show up an running?
+1Say your show in person last night. Great job. How did you mount the SS nodes to the eves and get them space so nicely?
You are not allowed to view links. Register or Login+1Say your show in person last night. Great job. How did you mount the SS nodes to the eves and get them space so nicely?A few pics of my roof line. I used 3" clear ornaments from Michaels. I then sanded ornaments to frost them. I made clamps that mount to fascia board out of scraps from Trex decking material i had left over from building my deck. The channel was cut from 16 ft. fence railing. I was able to rip the railing into 4 sections to get 64 linear feet of channel from one 16 ft. railing. I cut holes every 8" and then hot glued the ornaments into holes.