Software => xlights => Topic started by: ahb2ukeith on November 24, 2011,
-
I am new to the new version 2011c. I need help scheduling my playlist. Once I put all my sequences and mp3 files into the playlist, I then click the save icon. I then go the scheduler tab and there it lets me do nothing. All the buttons to the right are grey and unavailable to check or use. What am I doing wrong.
Keith
-
Is the Run Schedule unchecked?
Did you setup the Network?
Rick R.
-
The run was checked, but not able to uncheck. Decided, after he and half the family tried to figure it out, to download 2011b. Everything is working just fine now.
The network was setup.
Keith
-
This occurs when you delete all events with the Run Schedule box checked, then exit the scheduler.
It will be fixed in the next version of xLights.
Matt