Author Topic: Smart String Controller And Smart String Hub Co-Op  (Read 125068 times)

Offline wbuehler

  • Administrator
  • Sr. Member
  • *****
  • Posts: 3579
  • Dont' that poster look dusty?
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #255 on: January 14, 2011, »
Updated SSC Node Running Count

Please note that the Qty of the 50/50 nodes (Metal Square Ones) has been adjusted to 120 max due to current draw.

Thanks

Bill

« Last Edit: January 14, 2011, by wbuehler »

Offline wbuehler

  • Administrator
  • Sr. Member
  • *****
  • Posts: 3579
  • Dont' that poster look dusty?
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #256 on: January 14, 2011, »
SSC Max number of nodes based on current draw.

128 Smart String Nodes

120 of the (Metal Backed) 50/50 Nodes

80 of the (Plastic rectangle) 50/50 Nodes

Bill








Offline lightguy

  • Sr. Member
  • ****
  • Posts: 102
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #257 on: January 14, 2011, »
Please add to my previous order kit 3 one. The full order is now kit 1 four kit 2 one kit 3 one. Thanks

Offline OneHotRT59

  • Full Member
  • ***
  • Posts: 38
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #258 on: January 14, 2011, »
Slight Change   from original request...

Prior request..
Kit 1 = 16      Controllers
Kit 2 = 1        Hub
Kit 3 = 1        12v Option

Change Up To

Kit 1 = 20      Controllers      increase of +4
Kit 2 = 2        Hubs               increase of +1
Kit 3 = 1        12v Option      no change

OneHotRT59

Offline cubbieco

  • Full Member
  • ***
  • Posts: 74
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #259 on: January 14, 2011, »
I hope I made it in time.

Kit 1 = 16
Kit 2 = 1
Kit 3 = 1
Thanks

Offline wbuehler

  • Administrator
  • Sr. Member
  • *****
  • Posts: 3579
  • Dont' that poster look dusty?
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #260 on: January 14, 2011, »
Co-Op is now closed
Thread will now be locked

Bill


Offline RJ

  • Administrator
  • Sr. Member
  • *****
  • Posts: 8519
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #261 on: January 14, 2011, »
Be aware that I was asked the other night about having the optional 12v parts on the Hub and using the computer power supply. I mistakenly said it was ok. Mike (N1ist) woke me up and reminding me that the regulators would act like current sinks.

The designs intent was to have the place to add these parts for someone that was not going to run a computer power supply but only a 12v power supply. I never planned you would install them and then use a computer power supply.

If you are using any of the power supply connectors other than the 12V optional connector then you must not have the optional parts on the pcb.

I expected maybe 5% - 10% of the hubs to be ordered with the optional parts so the large amount of optional kits has had me wondering. This is why I posted that you did not need it unless you were using a 12 volt only non computer power supply.

RJ
Innovation beats imitation - and it's more satisfying

Offline wbuehler

  • Administrator
  • Sr. Member
  • *****
  • Posts: 3579
  • Dont' that poster look dusty?
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #262 on: January 15, 2011, »
All Co-Op members please review your orders on the 2nd post in the list. 
I will start on Monday January 17 2011 to use these totals for quotes.

Thanks

Bill


Offline wbuehler

  • Administrator
  • Sr. Member
  • *****
  • Posts: 3579
  • Dont' that poster look dusty?
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #263 on: January 15, 2011, »
I have received a few questions about what the amounts for the controllers will be based on current order quantity.

I am sorry but I can not provide any numbers until I get the quotes back from the vendors.

Bill


Offline wbuehler

  • Administrator
  • Sr. Member
  • *****
  • Posts: 3579
  • Dont' that poster look dusty?
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #264 on: January 16, 2011, »
Due to popular demand this Co-Op is back open.

Special thanks to JJ, RJ, and all the J's for helping sort this beast and allowing this Co-Op to re-open.

BUT NOTE:

This Coop will close at 8:00 P.M. EST –Monday, January 31, 2011.  Or sooner if called by the Co-Op manager, another DLA Administrator, or Moderator.

Offline wbuehler

  • Administrator
  • Sr. Member
  • *****
  • Posts: 3579
  • Dont' that poster look dusty?
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #265 on: January 16, 2011, »
Topic is now unlocked

Offline jnealand

  • Patron Member
  • Sr. Member
  • ****
  • Posts: 2494
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #266 on: January 16, 2011, »
Bill I would like to change my kit 1 qty from 4 to 10.  Thanks.
Jim Nealand
Kennesaw, GA

Offline gjbankos

  • Sr. Member
  • ****
  • Posts: 102
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #267 on: January 16, 2011, »
Can I ADD 1 kit #3 to my request?  Thank you!

Offline shaunkad

  • Sr. Member
  • ****
  • Posts: 417
  • 44241
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #268 on: January 16, 2011, »
A Big Thank You !

Please put me in for
kit 1  2
kit 2  1
kit 3  1

Thank you again

Offline odlids

  • Full Member
  • ***
  • Posts: 67
Re: Smart String Controller And Smart String Hub Co-Op
« Reply #269 on: January 16, 2011, »
Please put me in for

10 x Kit 1 (SSC pcb and parts)

1 x Kit 2  (SSH pcb and parts)

1 x Kit 3  (12V option parts)

Thanks
To err is human but why oh why must I be so human?