36
« Last post by taybrynn on July 17, 2023, »
I think at one time I might have had 16-18 ex[resses running.
I've been 100% RGB LED for 3-5 years now, but I still ran my neighbors house
with rock solid reliability on a single Lynx Active Hub ... running to SSC(s).
He leaves the SSC(s) in white PVC attached to his roof conduits and its made
it basically plug and play for him to do each year.
We control the Active hub with a pixelnet line out of a Falcon F16v2 and while its
been limited to one pixelnet universe, its been enough to run his whole house
for likely around a decade now.
To date, the Active hub and SSC combination is hard to beat.
We had an SSC go bad once, and I just swapped the chip from the bad SSC into
a back SSC ... and tada its all programmed and ready to go, since the chip is usually
fine and still programmed.