Just planning ahead for some wiring. I know every demo - and several comments - place the SSC in a PVC pipe hanging a few inches off the end of the string. If all the power is going through the cat5 anyway, is there any issue with putting the SSC in a safe/dry/out of site location along with the hub, power supply, etc, then putting the long length of cat5 between the SSC and the string?